Skip to content

, 6 October 2026

Latest Five candidates file for Karnataka's West Graduates' Council seat, with both camps in the fray

NOT SCRIPTEDNotScripted
News UpdateBengaluru & KarnatakaLiveBengaluru

Bengaluru's Green Line runs in a short loop for 45 minutes after a power breakdown

Trains were restricted to Silk Institute and Yeshwanthpur from 8 am on Tuesday, and the Yeshwanthpur–Madavara stretch was suspended, before BMRCL restored full services at 8.45 am.

By Priya Shankar · Bengaluru Correspondent, Bengaluru & Karnataka

Updated 2 min read

A Namma Metro train in Bengaluru, the network whose Green Line was suspended.
A Namma Metro train in Bengaluru, the network whose Green Line was suspended.Photograph: Fly2Blue (opens the file page on Wikimedia Commons in a new tab) via Wikimedia Commons, CC0. Illustrative photograph of the subject, not of the specific event reported.

The Green Line runs Madavara to Silk Institute; losing its northern end has no parallel metro substitute. — Illustration: NOT SCRIPTED

The short version

  • Green Line services were run as a short loop between Silk Institute and Yeshwanthpur from 8 am on July 21, 2026.
  • The Yeshwanthpur to Madavara section was suspended briefly, BMRCL said.
  • Normal revenue services resumed across the whole Green Line at 8.45 am, a disruption of about 45 minutes.

Bengaluru's Green Line was disrupted on Tuesday morning by a power breakdown, with trains running in a short loop between Silk Institute and Yeshwanthpur before full services were restored at 8.45 am. The disruption lasted a little under three-quarters of an hour.

In a BMRCL statement, the authority said Green Line services had been operating as a short loop between Silk Institute and Yeshwanthpur from 8 am because of the power failure, and that service between Yeshwanthpur and Madavara was suspended briefly. It added that technical teams worked on a war footing to restore the supply.

  • 08:00 — short loop in operation between Silk Institute and Yeshwanthpur.
  • During the fault — Yeshwanthpur to Madavara suspended.
  • 08:45 — power restored, normal revenue services resumed across the entire Green Line.

Where the line actually breaks

The Green Line runs from Madavara in the northwest to Silk Institute in the south, crossing most of the city, and the Yeshwanthpur–Madavara segment is the northern approach to the corridor that serves the airport-side and north Bengaluru traffic. A suspension there is not a shuttle replacement for a peripheral branch; it removes the northern end of the line from the network entirely for the duration.

Forty-five minutes is short by the standards of the outages Bengaluru commuters have learned to plan around. It is also long enough to force a substitution, because the corridor has no parallel metro route — the practical alternative for most of those passengers is the elevated Yellow Line, which reaches different parts of the city and not the same ones.

The authority closed its statement by thanking commuters for their patience. For a system carrying this many people every working morning, the ordinary test of resilience is not whether the failure happens but how long the loop runs, and on Tuesday the answer was forty-five minutes.

Sources — 2 references

These are the published sources this article was established against. NOT SCRIPTED wrote the text above; the sources below are credited to their own publishers.

  1. Deccan Chronicle (opens in a new tab)Publication · 21 Jul 2026
  2. India TV News (opens in a new tab)Publication · 21 Jul 2026

About the byline

Priya Shankar

Bengaluru Correspondent · Bengaluru & Karnataka · Bengaluru

The city's infrastructure, water and traffic problems, and the politics of fixing them.

Read about the NOT SCRIPTED newsroom and how our bylines work.

Matched on desk, Namma Metro, Green Line, BMRCL and publication window